
Medical Devices & Life Sciences
Medical device software with audit‑ready design controls
IEC 62304 and ISO 14971 evidence from one connected IBM Engineering Lifecycle Management toolchain, set up by consultants who work with medical device and life sciences teams.
The medical devices and life sciences sector
Medical devices are defined in software
Device manufacturers, diagnostics and life sciences companies and the suppliers of electronics, components and software behind them form the sector. Products range from infusion pumps and patient monitors to diagnostic systems and standalone software, and each one is placed on the market under the EU MDR or IVDR, FDA rules or both.
Every software function, in an infusion pump or in standalone software, has to be shown to be safe and effective before release, with risks controlled and verified, and again after every change in the field.
ShiftSoftware as a medical device
Standalone software and apps are regulated as devices, with IEC 62304 covering the whole software life cycle.
ShiftConnected devices
Devices connect to hospital networks and the cloud, so IEC 81001-5-1 security activities join the software life cycle.
ShiftFDA QMSR
Since 2 February 2026 the FDA quality management system regulation builds on ISO 13485, bringing US and EU design controls closer.
ShiftEU MDR and IVDR
Devices move to MDR and IVDR certificates, with deeper review of technical documentation by notified bodies.
Engineering challenges
What this means for software and systems engineering
Design controls across the life cycle
Design inputs, outputs, verification and validation need evidence for every design review, not only before submission.
Risk management linked to design
ISO 14971 risk controls have to be traced to requirements and verified, and stay linked after every change.
Software safety classes
The IEC 62304 class A, B or C of each software system decides which activities and documents it needs.
Electronic records and signatures
21 CFR Part 11 requires audit trails, controlled access and electronic signatures that stay linked to the record they approve.
Suppliers and SOUP
Software of unknown provenance and supplier components need their own requirements, risk analysis and version records.
Post-market change
Every complaint, CAPA and software update needs an impact analysis against the same design history.
What notified bodies expect
Where medical device teams lose time before an audit
Pick a problem to see the risk and how we remove it.


The risk file is a spreadsheet. Risk control measures are copied into the requirements document by hand and drift apart.
Show risk and fixShown below

Before each audit, trace matrices and test reports are exported and collected into folders.
Show risk and fixShown below

Design records live in the tools, but approvals happen by email or on paper, so the record and its signature are not linked.
Show risk and fixShown belowCompliance map
IEC 62304, ISO 14971 and ISO 13485, mapped to the toolchain
Pick a standard to see what it asks for, and where it lives in your toolchain once we have set it up. FDA design controls refer to ISO 13485, which builds on ISO 9001 and requires ISO 14971 risk management; IEC 62304 relates to ISO 13485 and also requires ISO 14971.

Compliance is achieved by your organization and confirmed by your notified body or the FDA. Tools hold the evidence; we set them up so the evidence is complete and easy to show.
Capabilities
What your team can do on day one
Baselines for every design review
Freeze a configuration for each design review and release, and compare it with the next one item by item. Auditors see exactly what changed, why and who approved it. Example: an infusion pump configuration ties requirements, architecture, tests, source code and the bill of materials from PLM into one design definition.
IBM Engineering Lifecycle Management Global Configuration Management
The risk file in the same chain
Hazards, hazardous situations and risk controls live next to design inputs and flow down to software requirements and tests.
IBM Engineering Requirements Management DOORS Next
Trace matrices that stay current
The trace matrix is a live view, so gaps and suspect links show up the day they appear, not at the next audit.
IBM Engineering Requirements Management DOORS Next
Reviews with electronic signatures
Design reviews and test approvals carry electronic signatures and an audit trail, linked to the exact version reviewed. Signatures cover tasks, reviews and change requests, requirement baselines, and test plans and test cases.
IBM Engineering Requirements Management DOORS Next
IBM Engineering Test Management
Exchange with suppliers
Requirements for suppliers go out and come back through Requirements Interchange Format (ReqIF), compared with the previous delivery.
IBM Engineering Requirements Management DOORS Next
Design history from live data
Trace matrices, verification summaries and technical documentation are generated from the tools, in your own document templates.
IBM Engineering Lifecycle Optimization – Publishing
IBM Engineering Test Management
See every product we implement and support
IBM Engineering Lifecycle Management and IBM Engineering AI Hub, HCL and GitLab: licenses, set-up, training and support from one team.
All products →
Device verification labWe start from your quality system and procedures
Your design control and risk management procedures become artifact types, link rules and review workflows in IBM Engineering Lifecycle Management. The documents your auditors already know are then generated from the tools, and we support your validation of the configuration.
Learn more
Tools, services and training for medical device teams

Products
IBM Engineering, HCL and GitLab tools for every step of the V: requirements, models, tests and DevOps.
See our products
Services
Requirements engineering consulting, implementation, migration from DOORS 9.x, hosting and support.
See our services
Trainings
Hands-on courses for administrators, engineers and test teams, remote or on site.
See our trainingsFAQ
Questions medical device teams ask us
Do we have to validate IBM Engineering Requirements Management DOORS Next and IBM Engineering Test Management?
Yes, as software used in your quality management system, and in proportion to the risk of each use. ISO 13485 asks for validation of such software before first use and after changes. We list the intended uses, assess the risk of each one, and prepare the configuration specification and test scripts for the uses that matter, such as electronic signatures, audit trails and trace reports. Your quality team approves the validation, and we keep it current with each upgrade.
How do we exchange requirements with suppliers and development partners?
Through ReqIF, agreed per partner. We set up an exchange definition for each supplier: which modules and attributes go out, which come back and who may edit them. Their answers are imported next to the previous delivery, so you see what changed before you accept it. SOUP and purchased components get their own requirements and version records, linked to the risk analysis, so a supplier change shows which risk controls to check again.
We have several models and markets of the same device. How do we avoid a separate design history for each?
With configurations instead of copies. Common requirements, risk controls and tests are kept once, and each model or market is a configuration that adds its own items. IBM Engineering Lifecycle Management Global Configuration Management records which version of each item a release uses, so the design history file for any model can be generated from its own baseline. A change to a common item shows every model it affects, with one impact analysis instead of several.
Our design history is in IBM Engineering Requirements Management DOORS (9.x). How do we move without breaking it?
Product by product, not all at once. Released products often stay on IBM Engineering Requirements Management DOORS (9.x) until their next design change, while new products start in IBM Engineering Requirements Management DOORS Next. When a product moves, modules, attributes and links move with their original IDs, and released baselines are kept, so earlier submissions stay reproducible. The migration is treated as a validated change, with a record of what moved. DXL scripts are inventoried first and most are replaced by configuration or views.
Our software developers use Atlassian Jira and GitLab. Can that stay?
Yes. Design inputs, risk controls and verification stay in IBM Engineering Lifecycle Management, where your design history needs them. Development work stays in Atlassian Jira and code in GitLab. We link work items and merge requests to the software requirements they implement, through OSLC-based integrations or a synchronization we configure for your process in IBM Engineering Integration Hub. The trace from risk control to code is then complete, and the integration itself is covered in your software validation.
How do IEC 81001-5-1 security activities fit next to ISO 14971 risk management?
In the same project, with separate artifact types and link rules. Threats, security risks and security requirements link to the same device functions, software requirements and tests as hazards and risk controls. Where a security risk can lead to harm, the link to the hazard is explicit. One change then triggers both safety and security impact analysis, and the software bill of materials and security test evidence come from the same baseline as the rest of the submission.
Watch and learn
Our Videos
Demos, tutorials, webinars and customer stories about IBM Engineering, DOORS Next and the other IBM and HCL tools we deliver.
1:09Archive old DOORS Next baselines (video, 1:09, opens YouTube)
RequirementsOct 2026
1:14Check the health of an IBM ELM server (video, 1:14, opens YouTube)
Platform setupOct 2026
1:05Fix a flat Excel import in DOORS Next (video, 1:05, opens YouTube)
RequirementsOct 2026
1:05Remove Word formatting from requirements (video, 1:05, opens YouTube)
RequirementsOct 2026
1:04Browse large DOORS Next modules as a tree (video, 1:04, opens YouTube)
RequirementsOct 2026
1:09Split and join requirements in DOORS Next (video, 1:09, opens YouTube)
RequirementsOct 2026
- 2023
6:18IBM Engineering at the Air Force Institute of Technology (video, 6:18, opens YouTube)
Customer storiesMay 2023 · PL · EN subtitles
- 2022
4:45Introducing HCL AppScan Standard (video, 4:45, opens YouTube)
Release and securityMar 2022 · by HCLSoftware
- 2020
38:31System test management with IBM ETM (video, 38:31, opens YouTube)
Test and qualityAug 2020 · PL
39:37Plan team work with IBM EWM (video, 39:37, opens YouTube)
DevelopmentJul 2020 · PL
52:03Requirements management with DOORS Next (video, 52:03, opens YouTube)
RequirementsJul 2020 · PL
4 parts · 59 minInstall an IBM ELM 7.0 trial environment (video, 4 parts · 59 min, opens YouTube)
Platform setupMay 2020
- Browse all videosdoorsnext.com/youtube-videos
Newsletter
The SmarterProcess newsletter
Tips, product news and webinar invites on IBM software, DOORS and the other vendors’ tools we deliver. One email a month.
Get it in your inbox











